According to different customer requirements, production pattern of the area of metal shredder production line need are very different, the size of the area of production line can affect the compactness and connectivity between various machinery and equipment, but also affects the production efficiency of metal shredder and production. For the first time to invest in the construction of the production line, the area of the site should be reasonably planned, including the length and width of the production line to meet the material shredding process of the whole production line. Because the metal shredder should consider reducing cost and increasing production efficiency when producing, the stacking of waste can be placed next to the feeder. Therefore, the area of the production line should be strictly planned.
First, the user will need to consider their own investment in the construction of metal shredder production line production pattern, for example: 1200 pieces of host machine, feeder can choose the length is 12 meters, 18 meters, 22 meters, 28 meters, etc., and then discharge machine conveyor length can choose the length is 6 meters, 10 meters, 14 meters and 18 meters, etc.
Second to consider the metal shredder auxiliary equipment area, such as: dust collector area, vehicle transport need to turn to when area, finished product material stacking area, raw materials needed (waste cans) stacking area, etc. The user can according to these data combined with their actual site planning area of metal shredder production line need is how old, the size of the floor space as possible than statistical data, in case the field size is not enough, production and processing will be inconvenience in the future.